SUBSEA OPERATIONS
Project
Management Onshore & Offshore
Production of Operational Procedures for Projects
Client Interface
AIR AND SATURATION DIVING SYSTEMS
SURVEYS
Independent
Surveys of In Use Air and Saturation Diving Systems to IMCA DESIGN
D-023 & D-024 or your specific requirements
Independent Survey of New Build Systems
PLANNING for NEW BUILD
or REFURBISHMENT
Conceptual Design
Feasibility Studies
Condition & Regulation Compliance Surveys
Project Scheduling
DESIGN CAPABILITIES
Conceptual
Design
Detailed Design including Equipment Requirements and Layout
Detailed Design Ensuring Compliance with the Required Regulatory
Bodies Standards
Interface with Classification Society & Applicable Regulatory Bodies
Piping and Instrumentation Diagrams
Electrical Schematics
Installation Procedures
Commissioning Procedures
Compilation of Document Packages |
  
CONSTRUCTION
Project
Management
Choice and Management of Sub-Contractors
Compilation of Document Packages
Interface with Classification Society & Applicable Regulatory Bodies
INSTALLATION
Installation Management
Compilation of Document Packages
Interface with Classification Society & Applicable Regulatory Bodies
COMMISSIONING
Commissioning Management including interfacing with your Client
Compilation of Document Packages
Interface with Classification Society & Applicable Regulatory Bodies
PRODUCTION of
DOCUMENTATION INCLUDING:
Dive System
or Component Operations & Workshop Manuals
Planned Maintenance Systems
Certification Schedules |